Bathroom remodel change order template

A bathroom is a small room with a large amount of water in it, so the surprises tend to be wet ones — a soft subfloor under the pan, framing with old staining, a valve that will not sit at the right depth in new tile. This page shows what the change order has to say to get those approved, with a worked example. The generator is free and needs no login.

No login, no email. The bathroom remodel template is preloaded and the PDF is yours to keep.

What a bathroom remodel change order must contain

These are the parts that decide whether the document settles an argument or starts one.

The change in room terms
Replace the subfloor under the shower, add a recessed niche, build a floating bench. Point at the wall it is on and the size, because “shower upgrade” is what a client remembers approving and it is not what you priced.
What was found, and when
The pan came out on the 14th and the subfloor was soft across roughly the shower footprint. Dated findings are what stop a concealed condition from being read as your mistake.
Price broken down by trade of work
Demo, framing, waterproofing, tile, plumbing, glass. A bathroom change crosses several trades, and a single total hides which part the client is paying for — which is exactly the argument you want to avoid.
Waterproofing and inspection consequences
Anything that changes the wet area changes the waterproofing detail and may change the inspection sequence. Say that the pan has to be flood-tested again and which day that happens.
The schedule, in days
A bathroom is a sequence: rough-in, inspection, waterproofing, flood test, tile, grout, glass. Any change lands somewhere in that chain. Name the days that move so the client does not assume the whole job slipped for no reason.
Signature, name and date
Approval on the same sheet as the number, before the tile is ordered or the framing is replaced.

The bathroom remodel traps that cost you money

Concealed water damage
Soft subfloor, stained joists, a shower that has been leaking into the ceiling below for years. It is not visible until demo and it is never in the client's budget. Photograph it, price the repair, and price the extra waterproofing it forces.
The niche, bench or body spray added mid-job
Every one of these is cheap to say and expensive to build correctly: framing, waterproofing, tile set-out and often a change to the valve. The client thinks it is a hole in the wall; the change order is where the real number lives.
Wet-area code and inspection
A curbless shower, a linear drain or a relocated valve can require a different slope, a different membrane and a different inspection. Additions that touch the wet area can also require the whole pan to be re-tested.
Tile set-out and layout
A larger tile, a different pattern or a full-height wall changes the number of cuts, the trim and sometimes the substrate. Layout changes are priced by the square foot and by the hour, and both belong on the document.

A filled-in bathroom remodel change order

Three line items, quantities, unit prices, markup and the total, with the reason written the way the homeowner needs to read it.

Change order

Sample Build Co.

Sample document — illustrative figures

Order
CO-003
Date
Apr 7, 2026
Client
Homeowner — primary bath
Project
14 Bishop Court
ItemQtyUnit priceTotal
Remove and replace water-damaged subfloor at shower, including joist sistering32 sq ft$12.00$422.40
Frame and waterproof recessed shower niche, 12 x 20 in.1 ea$210.00$241.50
Build floating bench, waterproofed and tiled to match1 ea$480.00$528.00
Subtotal
$1,074.00
Markup
$117.90
Total due
$1,191.90

Reason for the change

When the old shower pan came out, the subfloor under it was soft across the shower footprint and one joist had old water staining, so the framing has to be replaced before a new pan goes down. The owner also asked for a niche on the back wall and a floating bench while the walls were open.

Effect on schedule

Framing and new pan push the flood test back three working days. Tile start moves with it; glass is measured after tile.

Client signature

Printed name

Date

Contractor signature

Printed name

Date

Start from this template

When to issue one

  • Demo reveals rot, soft subfloor or old water damage that has to be repaired before the new pan or tile goes in.
  • The client adds a niche, bench, body sprays or a different shower configuration after the walls are open.
  • A valve, drain or supply has to move for the fixture the client selected, and the waterproofing has to be redone.
  • The tile selection changes size, pattern or coverage enough to change the substrate, the trim or the number of cuts.

Questions contractors ask

Who pays when the subfloor is rotten under an old shower?
The client does, if the change order says so before the repair is made. Rot under a pan is a concealed condition — it cannot be seen or priced at contract signing. Photograph it, describe it, price the repair, and get the signature before you cut out the damaged section.
Does adding a niche really need a change order?
Yes. A niche is framing, waterproofing, a different tile set-out and an extra visit from the tile setter. Small in conversation, not small in labour, and the client has no way to know that unless it is written down with a price next to it.
Is this bathroom change order template free to use?
It is. The generator needs no account, keeps your entries in your own browser, and downloads a real PDF. Sending to the client, e-signature and card payment are planned for the paid plans and are not available yet.

Put your name and price on it in two minutes

The generator opens with the bathroom remodel line items already in it. Edit them, add the reason, download the PDF, and hand it over before the work starts.